• Throughout the month there will be material deliveries. We will stay within the permitted traffic lanes for these deliveries.
  • We will be performing work on the exterior scaffolding throughout the month, which will produce general construction noise.
  • We will be removing scaffolding on the South elevation (opposite of Bryant St., behind building) the week of 4/19. This will require a flatbed truck staged on Harriet St. to offload the scaffolding.
  • We will be beginning excavation of utility work behind the building (opposite of Bryant St.) at the end of the month, which may require some trucks to stage and exit on Harriet St.