• Throughout the month there will be material deliveries. We will stay within the permitted traffic lanes for these deliveries. 
  • We will be performing work on the exterior scaffolding throughout the month, which will produce general construction noise. 
  • We will be installing a utility trench on Boardman Place near Bryant St. This work will be complete within existing barricades. 
  • We will be re-installing the traffic signal lights on Bryant St. / Boardman Place intersection now that the scaffold is removed at that corner of the building. This work will take place in early July. 
  • We will be dismantling scaffold on Bryant St. elevation in mid/late July. This will require trucks staged on Bryant St. within the permitted traffic lanes.   
  • We will be excavating, installing rebar, and pouring concrete throughout the month in the “backyard”. This may require some trucks staged on Harriet St., and appropriate traffic control will be used.