Utility work to connect domestic & fire water to the building will begin on 7/7/21 along Stevenson Street and 7/9/21 along Mission Street for the irrigation connection to existing domestic water. The work will be performed during the daytime through the end of July. This will involve small excavators excavating trenches along Stevenson Street and Mission Street, Monday to Friday. The SFPUC will perform this work per their Special Traffic Permit provided by the SFMTA. All excavation locations will be covered with plates while the work is not being performed.